New Build Snagging Survey Lessons as New Homes Ombudsman Complaints Triple: What Wimbledon Buyers Should Know (November 2026)

{"content":[]}

Complaints to the New Homes Ombudsman Service rose from 593 to 1,802 in a single year, and defects and snagging were the main issues raised [1][2]. For buyers in Wimbledon and across Merton, those figures make a strong case for an independent new build snagging survey, and for a written inspection report that will stand up if a complaint is later needed.

Updated 19 November 2026. This article is general information, not legal advice.

Key Takeaways

  • The New Homes Ombudsman Service (NHOS) annual report, published on 4 September 2026, recorded 1,802 complaints, up from 593 the year before [1].
  • Defects and snagging were the biggest issues, and slow or poor developer responses were a common thread [1][2].
  • More than 8 in 10 final decisions were upheld in full or in part in the homeowner's favour [1].
  • Average compensation was £919, so the ombudsman is mainly a route to getting defects put right, not a source of large payouts [1].
  • A clear, dated surveyor's report is the best evidence a buyer can bring to a developer, the ombudsman or a court.

What the New Homes Ombudsman annual report found

The report found that complaints about new homes roughly tripled in a year, with defects and snagging at the top of the list.

The headline figures were widely reported in the property press on and after 4 September 2026:

Measure Previous year Latest year
Complaints received 593 1,802
Final decisions issued 69 232
Cases settled by early resolution 186 575
Share of decisions upheld for the homeowner 78% 82%
Total compensation awarded almost £67,000 nearly £215,000
Registered developers not stated 581

Figures are taken from Mortgage Solutions, The Intermediary and The Negotiator [1][2][3].

Other points from the coverage are worth noting:

  • The average award was £919 and the highest single award was £20,000 [1].
  • Enquiries about defects rose by 162%, and enquiries about snagging rose by 205% [2].
  • Examples ranged from poor plaster and paint finishes and misaligned tiles to missing cavity wall insulation and fire safety equipment that had been fitted wrongly [2][3].
  • Around a third of new homes are still sold by developers outside the scheme [2][3].

The chief ombudsman, Nigel Cates, linked the rise to more homeowners becoming eligible and to growing awareness of the service. He also warned that, when developers respond slowly, "relatively manageable problems can become lengthy disputes" [2].

Why defects and snagging complaints are rising

Complaints are rising mainly because more buyers are covered by the scheme and know about it, not necessarily because homes are being built worse.

The number of registered developers grew to 581, an increase of about 26% [2][3]. A buyer can use the service only if the home was reserved after the developer joined [1]. As coverage widens, more buyers qualify.

The report also points to how complaints are handled. Slow replies, poor communication and delayed repairs turn small items into formal disputes [2].

The ombudsman's own advice to buyers is practical: check that the developer is covered before reserving, get promises in writing, inspect the finished home carefully and keep records of any fixes [2].

How a new build snagging survey fits into the process

A new build snagging survey is an independent inspection that lists defects and unfinished items so the developer can be asked to put them right.

The pre-completion inspection

Under the New Homes Quality Code, a buyer can appoint a suitably qualified inspector to carry out a pre-completion inspection. Brodies LLP explains that the inspector should belong to a recognised professional body in residential surveying, such as RICS or the RPSA, hold professional indemnity insurance and work within their competence [4].

The same guidance sets out some limits [4]:

  • The inspection takes place before completion, in a window that opens once the notice to complete has been served.
  • The inspector uses a standard checklist produced for the purpose.
  • A site manager may accompany the inspector.
  • Items found are normally treated as snagging and do not usually delay completion, unless a significant defect is found.
  • The buyer pays the inspector's fee.

After moving in

A fuller snagging survey can be carried out once the buyer has the keys. There is more time, the services can be run properly, and the surveyor is not tied to the standard checklist. Many defects, such as missing insulation or poor ventilation, are easier to spot once a home is occupied and heated.

For new-build flats, including schemes in and around Wimbledon, Colliers Wood and South Wimbledon, the survey should separate items inside the flat from defects in the common parts. Different parties are usually responsible for each.

The surveyor's report as expert evidence

A surveyor's report carries weight when it is independent, specific and tied to a clear standard, whether it goes to a developer, the ombudsman or a court.

Technical evidence can shape the outcome of an ombudsman complaint. DAC Beachcroft describes one build quality complaint in which an independent surveyor was jointly appointed, the buyer then obtained a second survey, and the ombudsman met both surveyors before deciding the remedy. The developer was told to repay the cost of the second report [5].

A report that is likely to help has these features:

  • Dated photographs of each item, with the room and location recorded.
  • A measured standard. Each item should say what is wrong and what tolerance or requirement it falls short of.
  • Sorting by seriousness. Cosmetic snags should be kept apart from defects that affect structure, weathertightness, fire safety or services.
  • Plain language. A complaint handler or judge should be able to follow it without a site visit.
  • A record of re-inspection. Follow-up visits show what was fixed, what was not, and how long it took.

There is a difference between a snagging report and formal expert evidence. If a dispute goes to court, opinion evidence is governed by CPR Part 35 and the expert's duty is to the court. A surveyor who prepared the original snagging list may be asked to give evidence of what was seen, but a separate independent expert is sometimes needed. Buyers and solicitors should raise that point early.

The ombudsman can order a developer to apologise, complete outstanding work, make good defects or pay compensation, up to a maximum of £75,000 [5]. With an average award of £919 [1], the realistic aim in most cases is to get the work done properly.

Practical lessons for Wimbledon and Merton buyers, landlords and solicitors

The main lesson is to build a paper trail from reservation onwards, so that any later complaint rests on evidence and not on memory.

  • Before reserving: check that the developer is registered with the scheme. Around a third of new homes are not covered [2].
  • At notice to complete: book the pre-completion inspection promptly. The Code allows only a few days after the notice is served [4].
  • On moving in: commission a full inspection and send the report to the developer in writing.
  • Keep a log: note every visit, promise and missed appointment. The report shows that slow responses often turn small items into disputes [2].
  • Investor landlords: inspect before the first letting. A schedule of condition taken at handover also helps to separate build defects from later tenant damage.
  • Solicitors: ask for the surveyor's report and the developer's replies before advising on whether the ombudsman, the warranty provider or a court claim is the better route.

FAQ

When to arrange a snagging survey?

The best time is as soon as the notice to complete arrives, so a pre-completion inspection can take place in the short window allowed under the New Homes Quality Code [4]. If that chance has passed, arrange a full survey shortly after moving in, and report the findings to the developer in writing without delay.

Do you need a survey for new construction?

No law requires one, but an independent inspection is sensible. The ombudsman's latest report shows that defects and snagging are the most common issues raised by new-build buyers [1]. Building control sign-off and a warranty do not mean every item has been checked for finish and workmanship.

What is a snagging checklist?

A snagging checklist is a room-by-room list of items to inspect in a new home, such as finishes, doors, windows, services and external areas. For a pre-completion inspection under the New Homes Quality Code, the inspector must use the standard checklist produced for that purpose [4]. A fuller survey can go further.

Is it worth paying for a snagging survey?

For most buyers, yes. More than 8 in 10 final ombudsman decisions went at least partly in the homeowner's favour [1], and clear evidence helps. An independent report gives the developer a precise list to work from and gives the buyer a dated record if the matter is escalated.

Conclusion

The rise from 593 to 1,802 complaints shows that new-build buyers are using their rights, and that defects and snagging are where most disputes start [1]. The ombudsman's figures also show that well-evidenced complaints usually succeed, at least in part.

Buyers in Wimbledon and Merton should check developer registration before reserving, use the pre-completion inspection, and keep an independent surveyor's report and a log of every reply. Landlords and solicitors should treat that report as the foundation of any later claim.

References

  1. Mortgage Solutions, Defects and snagging are biggest issues as complaints to New Homes Ombudsman triple (4 September 2026). mortgagesolutions.co.uk.
  2. The Intermediary, Complaints to New Homes Ombudsman rise 204% in 2025 (4 September 2026). theintermediary.co.uk.
  3. The Negotiator, Complaints soar to new-build ombudsman (7 September 2026). thenegotiator.co.uk.
  4. Brodies LLP, Pre-completion inspections under the New Homes Quality Code (28 November 2022). brodies.com.
  5. DAC Beachcroft, The New Homes Ombudsman Service (16 September 2024). dacbeachcroft.com.